On-going & Upcoming Project (under Central and State Government)

  • Construction of Civil & Structural Works at Nagaland Pulp & Paper Company Limited under A Joint Venture of Govt. of Nagaland and Hundustan Paper Corporation Limited, Paper Nagar, Mokochung, Nagaland-798623. (Project Cost US$ 57,055,830.94. & Construction Period 365 Days 70% completed)
  • 4 (Four) Lining of Jorhat to near Jhanji section from km 453.000 to km 491.050 (Design Km 453.000 to Km. 490.800) in the state of Assam under SARDP on EPC Basis (“Project”) invited by MoRTH, Govt. of India. Phase III programme. (Project Cost US$ 60,460,474.82. & Construction Period 1095 Days 10% completed)
  • 4 (Four) Laning of near Jhanji to Demow Section of NH-37 from km 491.050 to km 535.250 (Design Km 491.050 to Km 535.250) in the State of Assam under SARDP through EPC Basis (“Project”) invited by MoRTH, Govt. of India. of NH-37, package-II of 4/6 Lanning from Jorhat – Dibrugarh of NH-37 (Project Cost US$ 63,370,727.89. & Construction Period 1095 Days, 10% completed)
  • 2 (Two) Laing of Imphal-Kangchup-Tamenglong Road Highway, Which is a part of Asian Highway No. 1 (Package-1) from Ch 0+000 (Design Chainage Km. 0+000) to 103+020 (Design Chainage Km 103+020) & Spurs (Design Chainage Km 4+950 Km) in the State of Manipur, Phase-1, on EPC Mode’ Laying Earthen Road as per BOQ &Specifications from Km. 0+000 to Km. 60+970. Contact Value of Rs, 485,80,00,000. Crs. (30% completed)
  • CA-06-Part Design and construction of elevated viaduct and 6 elevated station viz. MTNL Metro, SG Bharve Marg, Kurla Terminus, Kurla East, EEH & Chembur [Excluding Architectural Finishing & Preengineered steel roof structure of Station] from Chainage 46749.923m to 52665.359m of Line 2B [D.N.Nagar-Mandale] of Mumbai Metro Rail Project of MMRDA amounting to Rs. INR 521,21,21,111/- (Five Hundred twenty-one crore and twenty-one lakh twenty-one thousand one hundred and eleven Only, On-Going in work is progress).
  • MMRDA/2B/MMRP/CA-14: Civil Construction of Depot Infrastructures comprising Stabling Yard, DCC and Administrative building, Maintenances and workshop buildings , ASS, Finishing, Plumbing, Earthworks for land development, Compound wall, Road & underground utility duct works etc. for Mandale Car Depot of Metro Line-2B of Mumbai Metro Rail Project of MMRDA amounting Rs. 390,43,68,327.34 (Rupees three hundred ninety crore forty-three lakhs sixty-eight thousand and three hundred twenty-seven only, On-Going in work is progress).
  • Construction of Versova Bandra Sea Link (VBSL) from Bandra to Versova, Total length – 17.17 km. On engineering, procurement & construction, EPC basis in Mumbai, Maharashtra, India. (Total Contact value US$ 918,129,602.78)
  • Project Name : “4 (Four) Laning of Nerchowk - Pandoh including Pandoh bypass section of NH-21 (Package-I km 190.000 to km 221.305) (Design length -26.290 km) under NHDP-IVB on EPC Mode in the State of Himachal Pradesh, India.” (Total Contract Value : US$ 114,602,271.84 (United State Dollars)
  • Project Name : “6 (Six) lane access controlled Greenfield highway from km 170+000 to km 200+000of Sangariya (near Chautala)-Rasisar (Near Bikaner) Section of NH- 754K. on EPC mode under Bharatmalas Pariyojana S tate of Rajasthan, India.” (Total Contract Value : US$ 43,320,446.40 (United State Dollars)
  • Project Name : 6 (S ix) Laning of Bodhre (K m. 390,000) to Dhule (K m. 452.800) Section of NH-211 (New NH No. 52); (Existing Length 62.800 km. Design Length 67.231 km) Under Bot (Toll) on DBFOT Pattern Under P hase NHDP-IV on Hybrid ANNUITY MO DE in the State of Maharashtra, India, Total Contract Value : US$ 128,911,146.56 (United State Dollars)
  • Project Name : A hiring of HEMM for removal of Over Burden (OB) including blast hole drilling, blasting, excavation of various rocks/soft earth cutting of OB strata(consisting of top soil, alluvium soil, blast rock, etc.), loading& transportation, dumping in dump yard, dozing, grading, Total Contract Value : US 146,370,599.20 (United State Dollars)
  • Project Name : Rehabilitation and up gradation to 2-lane with paved shoulders configuration of Dhamtari -Jagdalpur on NH-43 to be Executed on EFC Basis. (Package-II: Km 130.000 to Km 180.000) in the state of Chhattisgarh, India, (Total Contract Value : US$ 47,258,668.80 (United State Dollars)
  • Widening And Up-Gradation To 2 Lane With Paved Shoulder Configuration And Geometric Improvements From Km 339.000 To Km 380.000 On Aizawl-Tuipang Section Of Nh-54 (Package-8) In The State Of Mizoram With Jica Loan Assistance On Engineering, Procurement & Construction (EPC), Mode, Mizoram, India. (Total Project Value US$ 58,154,417.44)
  • Project Name : Construction Of Abstract Estimate Main Factory Building, Ancillary Unit, Humidification Plant Room, Office Building And Store Of (4 No-Unit Sheds) Of 25000 Spindles=100000 Spindles, A,B,C,D Type Quarter , M.D Quarter, Guest House(6m,9m,12m,15m Wide Internal Road), Drainage, Ginning Shed And Ginning Plate Forms, (Total Contract Value : US$ 49,096,505.92 (United State Dollars).
  • Project Name : Hiring of HEMM for Removal and Transportation of 9786.00 L. Cum of OB and 9712.00 L.cum of Rehandling of OB by out sourcing for the project Over Burden (OB)/MCL Lakhanpur, Jharsuguda District, Odisha, India, (Total Contract Value : US$ 90,710,389.28 (United State Dollars)
  • Project Name : Up-gradation 4/6 Lane of National Highway-27, section of NH-37 from Km 221.000 to Km 321.00 (Design Km 221.000 to Km 321.600) Dhadhaniya Sasan to Gujarat Border in the State of Rajasthan, India, (Total Contract Value : US$ 63,011,558.40 United State Dollars)
  • Project Name : Hiring of HEMM for Removal and Transportation of 1653.00 L. Cum of OB and 196.00 L. cum of Rehandling of OB by out sourcing for the project Nakrakonda-Kumardih B OCP 3.0 MTY under Burdwan, Lakhanpur District, West Bengal, India, (Total Contract Value : US 37,281,838.72 United State Dollars)
  • Project Name : Hiring of HEMM for Removal and Transportation of 2961.00 L. Cum of OB and 347.00 L. cum of Rehandling of OB by out sourcing for the project Nakrakonda-Kumardih B OCP 3.0 MTY under Burdwan, Lakhanpur District, West Bengal, India, (Total Contract Value : US$ 37,281,838.72)
  • Project Name :- Construction of infrastructure Development, Class Room Building, Library Building, Hostel Building, Shopping Mall Building, Health Unit Building, Criteria Building, Power Supply Unit Building, Administrative Block Building, Auditorium Hall Building, Chancellor & Vice-Chancellor Bungalow (Quarter), Type-VI, IV & Type II Quarter Building, Security Barak Building, Museum Building, Science City Building, Landscaping Design, Gardening and Plantation, Street Light for all University Campus, Internal Approach Road & Drainage, Children Park Construction, Compound RCC Wall for all University Boundary Including 4 Nos. of Main Gate & 12 Nos. of Emergency Gate, power plan 17 (Seventeen) Megawatt and Including Land Development, Interior Design & Furniture, Electronic item installations & Supply work for Dhanamanjuri University (DMU) under Government of Manipur, India, (Total Cost value : US$ 3,468,051,385.45 United State Dollars).
  • Project Name :- Construction of infrastructure Development, Class Room & Practical Class Room Building, Library Building, Hostel Building, Shopping Mall Building, Health Unit Building, Criteria Building, Power Supply Unit Building, Administrative Block Building, Auditorium Hall Building, Managing Director & Medical Superintendent Bungalow (Quarter), Type-VI, IV & Type II Quarter Building, Security Barak Building, Museum Building, Science City Building, Landscaping Design, Gardening and Plantation, Street Light for all University Campus, Internal Approach Road & Drainage, Children Park Construction, Compound RCC Wall for all University Boundary Including 4 Nos. of Main Gate & 12 Nos. of Emergency Gate, power plan 17 (Seventeen) Megawatt and Including Land Development, Interior Design & Furniture, Electronic item installations & Supply work for Marjing Homeopathy Hospital & Research’s Institute under Health and Family Welfare Department, Government of Manipur, India, (Total Project Value : US$ 2,650,611,104.18 (United State Dollars)